Marine Electric, Electronic, Automation & Control System
2023
2022
2021
AE No.2 – Electric Panel – KM Labobar| ACB| Shunt trip| Setting up
Shore Connection – Electric Panel – KM Dorolonda| ACB| Shunt trip| Setting up
2020
AE No.1, 2 dan 3 – Electric Panel – KFC Jet Liner| Modul intelligent NT Marine| Steaper motor DC| Speed sensor control| Setting up
Shaft Coupling – KFC Jet Liner| VulKan Coupling| Replacement
Electric Panel – KM Lognus 4| ACB| Shunt trip| Setting up
2019
ESB – Electric Panel – KM Nggapulu| ACB| Shunt trip| Setting up
AE No.1, 2 dan Shaft Generator – KM Lognus 2| Modul DEIF| Repair & Setting up
ACB Generator, Suku Cadang – KM Lognus 1| ACB| Shunt trip| Setting up
AE No.4 – Generator dan Panel – KM Lawit| Rewinding alternator| Installed & Setting up
Bow Thruster – Electric Panel – KM Kelud| ACB| Shunt trip| Setting up
AE no.1, 2 dan 3 – Alternator – KM CJN III-32| Panel syncronize generator| Repair & Setting up
AE No.3 – Alternator – KM Ciremai| Rewinding alternator| Installed & Setting up
Bow Thruster – Alarm System – KFC Jet Liner| MCCB| Contactor| Setting up
AE No.1, 2 dan 3 – KFC Jet Liner| Panel Paralel System dan Safety Device| Repair & Setting up
2018
FW Pump LT No.1 dan 2 – Electric Panel – KM Lognus 4| ACB| Shunt trip| Setting up
AE No.1 dan 2 – Electric Panel – KM Lognus 2| ACB| Shunt trip| Setting up
Kamewa No.2 – Reversing Cylinder Bucket – KFC Jet Liner| Reversing Cylinder Bucket| Repair & Setting up
AE No.1 dan 2 – Electric Panel – KFC Jet Liner| ACB| Shunt trip| Setting up
ME – KFC Jet Liner| Speed Control GAC| Sensor MPS| Setting up
Bow Thruster – Electric Panel – KM Binaiya| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Tilong Kabila| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel – KM Binaiya| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Lawit| ACB| Shunt trip| Setting up
AE No.3 – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
AE No.3 – Electric Panel – KFC Jet Liner| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Pangrango| ACB| Shunt trip| Setting up
Power Refer Container – KM Lognus 4| Panel electric| Setting up
Steering Gear – KM Ciremai| Control system
ECR Generator – KM Binaiya| Panel syncronize generator| Repair & Setting up
Capstain – Electric Panel – KM Leuser| ACB| Shunt trip| Setting up
Bow Thruster _ Electric Panel – KM Bukit Siguntang| Main Contactor| Setting up
Sewage Room – KM Pangrango| Panel Power Distribution| Repair & Setting up
Power Refer Container Deck 3 – KM Lognus 2| Panel electric| Setting up
AE No.2 – Electric Panel – KM Binaiya| ACB| Shunt trip| Setting up
AE No.2 – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Lawit| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Pangrango| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Leuser| ACB| Shunt trip| Setting upBow Thruster – Electric Panel
– KM Ciremai| ACB| Shunt trip| Setting up
2017
ME PS – Panel Distribusi No.5 – KM Pangrango| Panel electric| Setting up
ME PS – Panel Distribusi No.4 – KM Pangrango| MCB| Replacement & Setting up
Shore Connection – KM Pangrango| Shore Connection| Repair & Setting up
AE No.4 – Electric Panel – KM Kelimutu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Tidar| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Tidar| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel, 2, 3 dan 4 – KM Lambelu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Lambelu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Sinabung| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel – KM Kelimutu| ACB| Shunt trip| Setting up
AE No.2 dan 3 – Electric Panel – KM Kelimutu| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel – KM Kelimutu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Dobonsolo| ACB| Shunt trip| Setting up
Electric Panel – KM Ciremai| ACB| Shunt trip| Setting up
AE No.4 – Electric Panel – KM Tidar| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Binaiya| Modul DSS 31| Repair & Setting up
AE No.1 – Electric Panel dan 3 – KM Sinabung| ACB| Shunt trip| Setting up
AE No.3 – Electric Panel – KM Binaiya| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Awu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Binaiya| ACB| Shunt trip| Setting up
AE No.3 – Electric Panel – KM Pangrango| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Tidar| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Sirimau| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Nggapulu| ACB| Shunt trip| Setting up
AE No.1 – Electric Panel – KM Dobonsolo| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Bukit Siguntang| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Awu| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Umsini| ACB| Shunt trip| Setting up
AE No.2 – Electric Panel – KM Umsini| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Umsini| ACB| Shunt trip| Setting up
AE No.3 dan 4 – Electric Panel – KM Sirimau| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Lambelu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Ciremai| ACB| Shunt trip| Setting up
2016
Bow Thruster – Electric Panel – KM Dobonsolo| ACB| Shunt trip| Setting up
AE No.2 – Electric Panel – KM Bukit Raya| ACB| Shunt trip| Setting up
Bow Thruster, AE No.1 dan 2 – Electric Panel – KM Sirimau| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Sinabung| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Kelimutu| ACB| Shunt trip| Setting up
EDG – Electric Panel – KM Kelud| ACB| Shunt trip| Setting up
Electric Panel – KM Tatamailau| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Sinabung| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Awu| ACB| Shunt trip| Setting up
Bow Thruster – Electric Panel – KM Leuser| ACB| Shunt trip| Setting up
AE No.3 – Electric Panel – KM Tidar| ACB| Shunt trip| Setting up
2015
Bow Thruster – Electric Panel – KM Lawit| ACB| Shunt trip| Setting up
AE No.1 dan 3 – Electric Panel – KM Kelud| ACB| Shunt trip| Setting up
Electric Panel – KM Bukit Raya| ACB| Shunt trip| Setting up
AE No.2, 3 dan 4 – Electric Panel – KM Umsini| ACB| Shunt trip| Setting up