Marine Air Conditioning Plant, Provision Refrigeration Plant & HVAC


2023

AC Plant No.3 – KM Lambelu| Intermediate Part for Coupling SER 52/312| Coupling Hub For Motor Dia 80mm SER 52/312|Coupling Hub For Compressor S83SER 52/312| Replacement & Setting up.

AC Plant No.1 – KM Kelud| Condenser| Coupling Complete| Pressure Transmitter| ICM25-A 25 DIN| ICAD Motor 600| Solenoid Valve Block| Stop Valve SVH DN 150 Straight| Stop Valve SVH DN 25 Angle| Condenser replacement| Setting up.

Provision Refrigeration Plant – KM Sinabung| SW Condenser K573 HB| Setting up

AC Plant No.3 – KM Dorolonda| Service kit Compressor S83| Unisab III| STC Stop alve Angle DN A 125| STC Stop alve Angle DN A 150|m DIffrerent Pressure Gauge 100mm -1/25bar| EVRA 15| EVRA 32| Oil Filter Element| PT 100 Retrokit| Solenoid Valve Block| Sparepart Kit AMR 312| Indicator for Valve Vi| Dual Plate Wafer Check Valve DN200| General Overhaul Compressor| Piping & Valves| Setting up.

AC ECR – KM Ciremai| Compressor FX3| Replacement & Setting up


2022

AC No.2 dan 3 – KM Sirimau : Transmitter Angular Capacity| Service Kit Oil Filter| ICAD 600A| ICM 25 A 25DIN| ICM 20 A 20 DIN| Shaft Seal| O Ring Set| Repair| Piping & Valves| Setting up

AC Plant No.1 – KM Umsini| Service Kit VMY 336| Shaft Seal| Minor Overhaul| Setting up

AC Plant No.3 – KM Leuser| ICM 20 AD| Oil Filter Element|| Repair Cover Evporator| Piping & Valves| Setting up

AC No.2 dan 3 – KM Awu : 2 unit UNISAB II|Presure Transmitter| Shaft Seal| Service Kit Oil Filter|Transmitter Angular Capacity| Service Kit Oil Filter| ICAD 600A| ICM 25 A 25DIN| ICM 20 A 20 DIN| Shaft Seal| O Ring Set| Repair| Piping & Valves| Setting up

AC Plant No.2 – KM Egon | Compressor BFO 14| Evaporator| Fan Blower| EVRA 25| Replacement & Setting up

AC Plant No.1 dan 2 – KM Logistik Nusantara 3| Compressor 4NES-20Y| Replacement & Setting up

AC Plant No.1 – KM CIremai| Unisab III| Sparepart Kit| ICM 25 A 25 DIN| Safety Valve| Liquid Level Glass| General Overhaul | Setting up

Provision Refrigeration Plant No.2 – KM Leuser| Overhaul & Seting up

Provision Refrigeration Plant No. 1 dan 2 – KM SInabung| Overhaul & Seting up

Provision Refrigeration Plant No.1 dan 2- KM Ciremai| Overhaul & Seting up

AC Plant No.2 – KM Nggapulu| Shaft Seal Kit| VSM S83| ICAD 600A| EVA 32| ICM 32A 40 DIN| Controller for Expansion Valve| ACB 800 SACE| Panel Control PHTQ| Sparepart Kit AMR 312| EVRA 15| Overhaul & Setting up

Provision Refrigeration Plant No.2 – KM Wilis| Overhaul & Seting up

AC ECR – KM Wilis| Overhaul & Seting up

AC Plant No.1 – KM Wilis| Overhaul & Seting up

AC Plant No.1 – KM Sangiang| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.1 – KM Egon| Overhaul & Seting up

AC Plant No.1 – KM Bukit Raya| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Bukit Raya| System control setting up


2021

AC Plant No.2 – KM Umsini| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Binaiya| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Nggapulu| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Sirimau| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Sirimau| Overhaul & Seting up

Provision Refrigeration Plant – KM Dorolonda| Overhaul & Seting up

AC Plant No.1 – KM Tidar| PLC control system| Repair & Setting up

AC Plant No.2 – KM Nggapulu| Rewinding electromotor| Installed & Setting up

AC Plant No.1 – KM Awu| Service kit| Unisab III| Transmitter anguler position| Coupling SER 52/262 Complete|Flow Switch| Oil Pump| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.1 – KM Lambelu| Overhaul & Seting up

AC Plant, LO Priming Pump – KM Sirimau| LO Priming Pump| Repair & Setting up

AC Plant No.2 – KM Bukit Raya| Coupling Complete| Replacement

AC Plant No.3 – KM Lawit| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Tidar| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Kelud| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Dobonsolo| Condenser| Piping system| Replacement & Setting up


2020

AC Plant No.1 – KM Nggapulu| Overhaul & Seting up

AC Plant No.1 – KM Bukit Raya| System control setting up

AC Plant No.3 – KM Bukit Siguntang| Overhaul kit 30.000 hours| Major Overhaul| Setting up

AC Plant No.3 – KM Egon| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.1 – KM Lambelu| Overhaul & Seting up

AC Plant No.3 – KM Tilong Kabila| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Labobar| Overhaul kit 30.000 hours| Major Overhaul| Setting up

AC Plant No.3 – KM Sirimau| Rewinding electromotor| Installed & Setting up


2019

AC Plant No.1 – KM Wilis| Compressor| Condenser| Contactor Star-Delta| Panel Control PHTQ| Setting up

AC Plant No.1 – KM Umsini| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Umsini| Overhaul & Seting up

AC Plant No.3 – KM Tilong Kabila| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.1 dan 3 – KM Tidar| Overhaul & Seting up

AC Plant No.2 – KM Sinabung| Rewinding electromotor| Installed & Setting up

AC Plant No.3 – KM Sinabung| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant – KM Sinabung| Supply AC Compressor Sabroe type S82A-HP-E-V

AC Plant No.1 – KM Pangrango| Uniab III| Control System Setup

AC Plant No.1 dan 2 – KM Lognus 3| Overhaul & Seting up

AC Plant No.2 – KM Leuser| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.3 – KM Lawit| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.1 – KM Labobar| Overhaul & Seting up

AC Plant No.1 – KM Kelimutu| Overhaul & Seting up

AC Plant No.2 – KM Dorolonda| Overhaul kit 30.000 hours| Major Overhaul| Setting up

AC Plant No.1 – KM Dobonsolo| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Ciremai| Shaft seal| Setting up

AC Plant No.3 – KM Ciremai| Compressor| Replacement| Setting up

AC Plant – KM Ciremai| Supply AC Compressor Sabroe type VMY 347

AC Plant No.2 – KM Bukit Raya| Service kit| Unisab III| Transmitter anguler position| Coupling SER 52/262 Complete|Flow Switch| Oil Pump| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Binaiya| Compressor [eks AC Plant no.3]| Unisab III| Setting up

AC Plant No.2 – KM Awu| Compressor| Condenser| Contactor Star-Delta| Panel Control PHTQ| Setting up

AC Plant No.3 – KM Awu| Overhaul kit 30.000 hours| Turning Capacity Transmitter| Control Panel| Contactor Star-Delta| Major Overhaul| Setting up


2018

AC Plant No.3 – KM Umsini| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Umsini| Overhaul & Seting up

AC Plant No.1 – KM Tidar| Electric System| Repair & Setting up

AC Plant No.1 – KM Sirimau| Heater Separator| Repair & Setting up

AC Plant No.2 – KM Sirimau| Compressor| SW Cooling Pump| Cover evaporator| Unisab III| PHTQ| EKS 65| Pipes & Valves

AC Plant No.1 – KM Kelud| Coupling Complete| Replacement

AC Plant No.3 – KM Bukit Raya| Service kit| Condenser| Evaporator| Panel Control| EVRA 32| ICM 25| ICAD| EKC 315| Coupling SER 52/262|Flow Switch| Turning Capacity Transmitter| Setting up

AC Plant No.1 – KM Bukit Raya| Shaft seal| Capacity Slide| Suction filter| Service kit| Setting up

AC Plant No.2 – KM Lawit| ACB| Shunt trip| Setting up

AC Plant No.2 dan 3 – KM Kelimutu| MCB| Replacement & Setting up


2017

AC Plant No.2 – Pelni| Service kit| Unisab III| Turning transmitter anguler position| Coupling SER 52/262 Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant – KM Leuser| Supply AC Compressor Sabroe SAB 163 HM

AC Plant No.2 – KM Tilong Kabila| Compressor| Cover evaporator| Unisab III| Pipes & Valves

AC Plant No.1 – KM Bukit Raya| Coupling Complete| Replacement

AC Plant No.3 – KM Bukit Siguntang| Coupling Complete| Replacement

AC Plant No.1 – KM Sinabung| Coupling Complete| Replacement

AC Plant No.1 – KM Tilong Kabila| Coupling Complete| Replacement

AC Plant No.3 – KM Kelimutu| Coupling Complete| Replacement

AC Plant No.2 – KM Dorolonda| Coupling Complete| Replacement

AC Plant No.1 – KM Egon| Coupling Complete| Replacement

AC Plant No.3 – KM Egon| Service kit| Unisab III| Coupling Complete| Contactor Star-Delta| General Overhaul & Setting up

AC Plant No.2 – KM Bukit Siguntang| Overhaul kit 30.000 hours| Major Overhaul| Setting up


2016

AC Plant No.2 – KM Sirimau| Coupling Complete| Replacement

AC Plant No.1 – KM Binaiya| Coupling Complete| Replacement